SWIMMING POOL MAINTENANCE SUPER CHLORINATION OR SHOCKING
In voluntary wastes like perspiration
nasal discharge, fecalmatter and urine from bathers are constantly introduced
in to the pool. Organic cause swimming pool water
to become dull listless and cloudy.
Addition of high levels of chlorine to allow much of these organic to be
oxidised in to dissolved solids is known as “Super Chlorination of
shocking. Super chlorination is recommended
at least once in a week for a well used pool with a FC level of 10 - 15 PPM.
swimming pool contractors dubai |
Break
Point Chlorination
Super chlorinating the swimming pool to reduce
high levels of combined chlorine is known as break point Chlorination.
Break Point Chlorination should be necessary
within the free chlorine level is above 0.2PPM.
Safety
Limits for Chlorine
Safety Limits for chlorine outlined by swimming pool
water treatment advisory group is as given below :-
“Free chlorine level should be at the lowest
concentration that gives satisfactory microbiological quality. Free chlorine residual above 2PPM should be
necessary unless re-circulation is slow, distribution poor or bathing loads too
heavy. Swimming Pool Free chlorine levels above 3PPM
are unlikely to be necessary chlorination should be reduced. Above 5PPM chlorination should be stopped
immediately and above 10PPM bathing should cease.”
As a general rule it is advised that
the free chlorine levels should be maintained between 1PPM - 3PPM to achieve
proper swimming pool water sanitation and to optimise usage of chemicals.
No bathers should be allowed to swim at chlorine
level 10PPM and above in the swimming pools.
SAFETY
RULES FOR HANDLING SANITISING PRODUCTS.
Each chemical should be strictly
identified and stored separately within swimming pool plantroom to avoid misuse and
malfunction. Only a few days requirement
should be stored in the plantroom in containers with clear labels of each
chemical.
Always add chemical to swimming pool water. NEVER add water to chemicals.
Keep chemicals away from sunlight.
Never mix chemicals prior to dispensing
in swimming pool water.
Never use emptied chlorine pots for
re-use or storage of other chemicals.
Never combine different chlorine
products.
Never put Ticca tablets in Automatic
chlorinator.
Never mix Acid with Chlorine.
Preventive Maintenance.
Test the swimming pool water daily/hourly as per the
monitoring chart.
Adjust
the meters, and calibrate if required check offset of the knob if any and
rectify.
If the ppm or
pH are outside the meter range.
Investigate and correct the cause of the
problem.
Re-calibrate
the meters.
Clean the sensors in hydrochloric acid and then
in clean water twice a week.
Infinite Leisure is the best swimming pool companies in dubai.
Note:
It is better for you to hire proper swimming pool maintenance companies to maintain your swimming pool.